Site Control Panel

June 29, 2026

Active: Substructure & Foundations
Target Handover Countdown

October 31, 2026

000
:
00
:
00
Overall Project Schedule Progress 0%

Substructure Progress

0.8% Cast (0/140)
3 Excavated
0 Rebar Bind
0 Casted

Active Site Metrics

21 Labor Count (Today)
34°C Dry & Sunny
0.0 m³ M25 Poured
0.00 t Steel Consumed

Recent Site Logs

View All

Drawing Guidelines

  • Concrete Grade:

    M25 mix (OPC 53/PPC, min 340kg/m³). Ratio 1:1.5:3.

  • Steel Deformed:

    Fe415/Fe500 (marked "Y" on site).

  • Clear Cover:

    Footing: 50mm | Column: 40mm | Beam: 30mm.

Warehouse Grid Map

Interactive layout tracking 140 column footings across Grids A–Z and 1–15.

Pending Marked Excavated PCC Poured Rebar Ready Casted Backfilled

Intersection A-15

F10
2600 x 2600 x 550 mm
Y12 @ 140 c/c both ways
P10
800 x 1150 mm
20 - Y25, Ties: Y10 @ 200 c/c
Status History
Feedback & Comments

Site Plot Boundary & Orientation Map

Based on Marking Layout Drawing KC-6703-01. Shows setbacks to compound walls and main bituminous access roads.

SOUTHERN COMPOUND WALL (180m Boundary) NORTHERN COMPOUND WALL (Adjoining Bituminous Road) WESTERN COMPOUND WALL EASTERN COMPOUND WALL (Yard Space) BITUMINOUS ACCESS ROAD (NORTH) BITUMINOUS ROAD (WEST) WAREHOUSE FOOTPRINT 180m x 100m (18,000 sq.m.) Active Corner (Grid A-15) Left Setback: 92.5m Right Setback (Yard): 150.5m Front Setback: 13.1m - 15.2m Rear Setback: 6.1m

Drawing Spec Sheet Info

Marking Layout Plan

  • Drawing No: KC-6703-01
  • Rev: R0 (22.06.2026)
  • Draftsman: jemil s
  • Engineer: S. Subramaniam
Site Clearance Note: Ensure the western and northern setbacks are verified by the surveyor using coordinates before excavation begins on Row 1 and Grid Z.
Open Marking Layout PDF

Drawing Database

Substructure Material Calculator

Quickly calculate concrete and reinforcement requirements for various footing shapes directly from drawing specifications.

Measured from top of footing to plinth beam level. Drawing standard is 2.4m footing depth.

Material Deliveries & Log

Date Material Quantity Supplier / Vehicle No. Inspector Status

New Daily Site Entry

Labor Headcount Details

Historical Site Diary

Total Projected Budget
₹ 2,45,00,000
Tarakeswara Site Phase 1
Total Expenses Incurred
₹ 0.00
Based on logged purchase orders
Remaining Balance
₹ 2,45,00,000
Unallocated funding

Record Project Expense

Upload concrete invoices, purchase vouchers, etc.

Project Expense Ledger

Date Category Amount Description Voucher

Create New User

Authorized Users

Username Role Action

Daily Task Progress Log

Update actual completion percentage for any construction schedule task.

Progress Updates Ledger

Chronological ledger of task progress completions recorded by engineers.

Date Task Name Progress Recorded By Notes
M20 Grade Concrete

0.0 m³

Slab Screeds & PCC Blinding
M25 Grade Concrete

0.0 m³

Foundations & Slab Bedding
M30 Grade Concrete

0.0 m³

Pedestals & Frame Columns
M50 Grade Concrete

0.0 m³

Precast Yard & Heavy Girders

Record Concrete Pour

Log details of a casting pour for active site components.

Concrete Pouring Ledger

Historical ledger of all concrete mixes poured, tested, and approved on site.

Date Grid Grade Element Qty (m³) Slump (mm) Cubes Logged By

Sullurpeta Proposed Factory Building Schedule

High-level project timeline spanning from June W4 to October W4. Red bar indicates current progress week.

Handover: Oct 31, 2026
Task Description
JUNE
W4
JULY
W1
W2
W3
W4
AUGUST
W1
W2
W3
W4
SEPTEMBER
W1
W2
W3
W4
OCTOBER
W1
W2
W3
W4

Weekly Plan vs. Weekly Actuals Tracking

Compare target scheduled progress against actual achievements on site across weekly intervals.

Avg Planned Target

0%

Target for week
Avg Actual Progress

0%

Achieved on site
Percent Plan Complete (PPC)

0%

Tasks meeting target
Schedule Variance

0%

Schedule Status

Task Breakdown: Plan vs Actual

WBS Task Description Planned % Actual % Variance Status Observations / Remarks

Log Weekly Plan Target

Set planned target vs actual completion for site tasks in specific weekly windows.